Login
1962-65 Miss Bardahl Photo Gallery Restoration Engine Overhaul Second Engine December 26, 2007 - Initial Disassembly Engine out in the shop.
Advanced Search

Engine out in the shop.

There is an I-beam track above the pallet racking with a chain hoist that is used to lift the engine. Blower & wheelcase will be removed before going in the roll-over stand.

Date: 12/26/2007
Size:
Full size: 1600x1200
nextlast
first previous
Engine out in the shop.
nextlast
first previous
Powered by Gallery v2.2